Santa Ana Star Casino Hotel

About This Project

service(s) provided: General code consulting and Fire Protection Report (FPR)

location: 54 Jemez Canyon Dam Road, Santa Ana Pueblo, NM

description of the project: The project consists of an expansion of the existing Santa Ana Star Casino is proposed on the southwest corner of the property. The expansion includes two (2) podium levels with seven (7) hotel tower levels atop encompassing a total of approximately 214,582 ft2across nine (9) stories.

The new podium levels interface with the existing Santa Ana Star Casino areas on Levels 0 and 1. Level 0 consists of an entry lobby and check-in area, fitness center, indoor pool area, equipment rooms, and warehouse. Level 1 is comprised of ballrooms, conference rooms, restaurants, and casino gaming areas. The Level 0 entry lobby is considered an atrium as it will be open to Level 1 above.

Guestrooms start on Level 2 and comprise seven (7) stories all together with a tower footprint of 17,717 ft2.

description services provided: General fire protection/life safety code consulting throughout all phases of the project including code and egress analysis, fire sprinkler and fire alarm provisions, fire pump system parameters, and emergency elevator operations. A FPR was provided for design team coordination and submittal with the permit package outlining applicable fire/life safety provisions of the project. As part of the Construction Administration phase, TERPconsulting responded to Requests for Information (RFI) and reviewed fire alarm, sprinkler, and other life safety construction submittals. In addition, TERPconsulting provided egress drawings for the new hotel tower and podium expansion areas.

 

 

Category
Gaming/Hospitality, General Code Consulting, Tribal Gaming