Archive

Project Description University Gateway is a mixed-use development project located Near UNLV. Phase 1 included a seven (7) story open parking garage along with UNLV Police headquarters; the Phase 1 building...

Description Two Summerlin Office Building in Downtown Summerlin. Provided Smoke Control Inspection and Testing Services for two tenant build-outs. Service(s) Provided Smoke Control Mechanical Quality Assurance Agency (MQAA) inspection and testing services. Testing...

Description A non-gaming property located on The Las Vegas Strip. The property includes 389 guest rooms and suites. Service(s) Provided Prepared Tenant Improvement Fire Protection Reports (TIFPRs) for several guest room remodels. A...

Description Red Rock Resort & Spa Las Vegas is located 10 miles from The Las Vegas Strip. Service(s) Provided Prepared Tenant Improvement Fire Protection Reports (TI FPRs) for several projects at the resort...

Description The Las Vegas Raiders Training Facility located in Henderson, NV. The facility includes Three (3) outdoor fields and 1½ indoor fields, lockers and training rooms, Fieldhouse building with support offices. Service(s)...

Description The Las Vegas Convention Center Phase Two Expansion is a $935 million project that adds a new 600,000-square-foot West Hall, increasing the total Las Vegas Convention Center campus exhibition space...

Description 52-story hotel located on The Las Vegas Strip. Services Provided Provided Smoke Control Mechanical Quality Assurance Agency (MQAA) inspection and testing services for three floors that underwent a remodel. Prepared testing scenarios...

location: 3770 S Las Vegas Blvd., Las Vegas, NV services provided: Smoke Control Mechanical Quality Assurance Agency (MQAA) inspection and testing services, Third party fire modeling peer review. description of project: A...